Laserfiche WebLink
Page 2 of 5 <br />property. Please provide a plan in the application showing how construction equipment will <br />access the west side of Reed Wash. <br />Rule 2.04.10 Vegetation Information <br />25. Item Resolved. <br />25a. Item Resolved. <br />26. Item Resolved. <br />27. The explanation given as to why the cover data appeared to be collected sequentially in the pre - <br />disturbance area and sequentially /selectively in the reference area to meet sample adequacy <br />does not justify why the collection method changed midway through sampling. The Division <br />maintains its position that data collection needs to be performed consistently, either <br />systematically or randomly, for the entire data collection. However, the solution to change the <br />appearance of inconsistent data collection is to re- sample the pre- disturbance area and the <br />Division does not believe this is practical or necessary. Therefore, the Division accepts the <br />baseline vegetation data in its present form, but suggests that during future vegetation data <br />collection a single method be predetermined before collection begins and the method be <br />followed throughout the entire data collection process. Item resolved. <br />27a. Item Resolved. <br />27b. Item Resolved. <br />27c. Item Resolved. <br />27d. Please submit the corrected tables 10 -4, 10 -5 10 -6 and 10 -13 when CAM receives them. <br />28. Item Resolved. <br />29. Item Resolved. <br />30. Item Resolved. <br />31. Item Resolved. <br />32. Item Resolved. <br />33. Item Resolved. <br />34. Item Resolved. <br />35. Item Resolved. <br />36. Item Resolved. <br />