Laserfiche WebLink
SOP No. 5.0 Monitoring Well Installation <br />tensiometers will be installed to determine matric potential of damp strata. The Type 4 well will <br />consist of a monitoring well and a tensiometer completed in the same large diameter drill hole. <br />The Type 4 completion will be installed if both a water - bearing and damp strata are found in the <br />same drill hole. <br />6.0 DOCUMENTATION <br />Documentation of observations and data acquired in the field will provide information on the <br />activities concluded and also provide a permanent record of field activities. As necessary, the <br />observations and data will be recorded on the following database forms or log books: <br />• Drillhole Form <br />• drill_log <br />• Field Activity Form <br />• Fieldphotos_Subforrn <br />• Screening_Subform <br />• Tailgate_SafetyMtg_Form <br />• Waterlevel Subform <br />Field forms will be entered into the electronic database on a daily basis. <br />6.1 DRILL LOG <br />A Field Geologist experienced in borehole drilling will be present on site for consultation <br />purposes. This geologist will be responsible for logging samples, monitoring drilling operations, <br />recording water losses or gains and groundwater data, and preparing field boring logs. The <br />procedures for lithologic logging of boreholes are contained in SOP No. 3.0, Borehole Logging. <br />Boring log information will also be recorded on the Drillhole_form and Drill_Log form and <br />subform or suitable alternative field form. <br />7/28/08 <br />5-8 R Incorporated <br />