Laserfiche WebLink
New Access Road Construction Work Plan <br />Exhibit D — Attachment 1 <br />o Remove trees, slash and properly store materials in designated areas; <br />• If required, obtain DRMS signatures on daily work sheets; <br />• Prepare and submit "as- built" drawings; <br />• Prepare "As built" drawings showing, at a minimum, where center lines, cuts and fills <br />have been established will be submitted to DRMS in the 4 of 2011; <br />• Place and locate survey monuments on a base map to monitor road fill stability; <br />• Submit monthly monitoring reports on a quarterly basis (unless movement is <br />recorded) to County and DRMS within 10 days of receipt of results from surveyor; <br />and <br />• Summarize the results of corrective action taken in reports if allowable movement <br />thresholds exceeded. <br />Health and Safety <br />• A health and safety plan will be developed by the selected Contractor; <br />• Wildcat will conduct daily tailgate safety meetings; and, <br />• Health and safety tailgate meetings will be recorded in the daily log books. <br />Regulatory Liaison <br />Regulatory communications will be directed to the DRMS the attention of: <br />Company Contact <br />Mr. Wally Erickson <br />Colorado Division of Reclamation Mining and Safety <br />691 County Road 233, Suite A -2 <br />Durango, CO 81301 <br />970.247.5469 <br />Company communications should be directed to: <br />George M.L. Robinson - Agent <br />R Squared, Inc. <br />5555 DTC Parkway, Suite 4000A <br />Greenwood Village, Colorado 80111 <br />303.832.7664 <br />720.641.2534(c) <br />or <br />Wildcat Mining Corporation <br />May Day Idaho Mine Complex — 112d Permit Application <br />Revised August, 2011 <br />Exhibit D — Attachment 1 <br />Page 14 of 15 <br />