Laserfiche WebLink
New Access Road Construction Work Plan <br />Exhibit D — Attachment 1 <br />o Culvert Installation; and, <br />o Clearing the cut slope. <br />• October 28, 2009 - Memo from Allen Sorenson to Wally Erickson - Third <br />Adequacy of Access Road Construction. Issues addressed included: <br />o Geotechnical stability; <br />o Revegetation; and, <br />o Retaining walls. <br />• June 4, 2010 - Memo from Mr. Allen Sorenson to Wally Erickson - Access <br />Road Review - Issues addressed included: <br />Wildcat Mining Corporation <br />May Day Idaho Mine Complex — 112d Permit Application <br />Revised August, 2011 <br />Exhibit D — Attachment 1 <br />o Earth Fill compaction; <br />o Erosion and sedimentation controls; <br />o Disturbance to the hydrologic balance; <br />o Construction Quality Control Quality Assurance; and, <br />o Stabilization. <br />• June 7, 2010 - Memo from Mr. Allen Sorenson to Wally Erickson - Access <br />Road Review - Issues to be addressed included: <br />o Earth Fill compaction; <br />o Erosion and sedimentation controls; <br />o Disturbance to the hydrologic balance; <br />o Construction Quality Control Quality Assurance; and, <br />o Stabilization. <br />• March 11, 2011 Memorandum - Geotechnical Responses to Cazier's <br />Comments. Issues Addressed include: <br />o Slope configuration; <br />o Portal geotechnical stability; and, <br />o Steel set foundation characterization. <br />• May 7, 2011 Review of Access Road Geotechnical Stability. Issues addressed <br />include: <br />o Slope configuration; <br />o Access Road Repairs and Maintenance; <br />o Road grades; <br />o Retaining walls; <br />o Historical stormwater control requirements; and, <br />o Road load limits. <br />Page 3 of 15 <br />