My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-09_REVISION - M1981185 (68)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-08-09_REVISION - M1981185 (68)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:16 PM
Creation date
8/10/2011 8:53:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
8/9/2011
Doc Name
CN-01 112d permit application Exhibit A thru F
From
Wildcat Mining Corporation
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mining Plan <br />Exhibit D <br />installed along the existing and future planned roads and the benches. (See Attachment <br />D -1). The SWMP has also been submitted to the CDPHE and is awaiting approval. As <br />necessary, Wildcat will submit a copy of a revised SWMP reflecting CDPHE comments <br />when CDPHE approval has been obtained. <br />C. Repair of May Day No 1., May Day No. 2, and Chief Portal <br />The work plans for the various mine components follows: <br />• The May Day No. 1 collapsed portal and bench will be repaired in accordance <br />with the work plan presented in Attachment D -2, as illustrated on Figure D -1 and <br />Exhibit 6.5; <br />• The May Day No. 2 drainage work plan is presented in Attachment D- 3; and, <br />• The Chief Portal stabilization and drainage work plan is presented in Attachment <br />D -4. <br />D. Mill Retrofit and Commissioning <br />Following stabilization of the May Day No. 1 portal (See Attachment D -2), any damage <br />to the mill equipment will be repaired. Additionally, the following modifications will be <br />made to the mill, portal and the adit: <br />• Aligning and repairing, and testing the ball mill in the May Day No. 1 mill; and, <br />• Installing a filter press or suitable alternative to make a dry tailing filter cake. <br />(See Attachment D -2 and Attachment D -5). <br />The conceptual mill processing schematic is presented in Figure D -2 and Figure D -3. <br />Tailings will be piped less than 50 feet in dual - walled pipe to the tailings dewatering <br />equipment (See Attachment D -2 and Figure D -1) where the dry cake will be loaded into <br />hoppers. The solids will be moved underground for disposal using loaders such as a skid <br />steer. Water from the dewatering unit will be recycled through the mill as illustrated on <br />the material and process water flow sheets Figure D -2 and Figure D -3. As -built <br />construction drawings will be submitted 45 days following completion of construction. <br />E. Dry Stacked Tailings <br />Based upon preliminary sampling, Wildcat has demonstrated that the mine rock is not <br />hazardous or toxic producing, and has demonstrated the chemicals to be used to <br />concentrate ore will not impact the environment. (See Attachment U -4). After 100 years <br />of mining, the La Plata River and Deadwood Gulch have not been impacted by surface or <br />groundwater within the study area. Based on existing analytical, proposed implemented <br />BMPs, and the fact that no impacts to water quality from historic mining have been <br />detected, Wildcat predicts there will be no impacts from future mining <br />Wildcat Mining Corporation <br />May Day Idaho Mine Complex — 112d Permit Application <br />Revised August, 2011 <br />Exhibit D — Rule 6.4.4 <br />Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.