Laserfiche WebLink
i <br />Divide Constructors <br />Engineering I Fabrication 1 Steel Erection <br />June 24, 2011 <br />Varra Companies <br />8120 Gage Street <br />Frederick, CO 80516 <br />Attn: Brad Jones <br />Re: Heintzelman Pit - Budget for dismantling the road crossing bridge. <br />Brad, <br />PO Box 438 <br />Berthoud, CO 80513 <br />Telephone: (970) 532 -3761 <br />Fax: (970) 532 -0567 <br />The following are our cost estimates for dismantling the road crossing bridge and staging the <br />equipment at the pit. <br />1. Dismantle the road crossing bridge: <br />- Includes: <br />o Crane Budget: $ 3,500.00 <br />o Flatbed Truck to haul bridge pieces to staging area: $ 500.00 <br />o Equipment Budget to demo and remove concrete: $ 2,000.00 <br />• Breaker, excavator, dump truck. <br />o Wind belt: $ 500.00 <br />o Labor to remove bridge, concrete, reclaim: $ 4,000.00 <br />o Management /Overhead and Mark up: $ 1,000.00 <br />Total Estimate: $11,500.00 <br />If you have any questions regarding these cost estimates, please give me a call. <br />Thank you, <br />Joe Doherty <br />(970) 215 -3166 <br />