Laserfiche WebLink
i <br />Divide Constructors <br />Engineering Fabrication Steel Erection 1 <br />i <br />September 8, 2010 <br />Varra Companies <br />8120 Gage Street <br />Frederick, CO 80516 <br />Attn: Brad Jones <br />Re: Heintzelman Pit - Budget for dismantling the field conveyor from the Heintzelman Pit. <br />Brad, <br />PO Box 438 <br />Berthoud, CO 80513 <br />Telephone: (970) 532 -3761 <br />Fax: (970) 532 -0567 <br />The following are our cost estimates for dismantling the 40ft. truss field conveyor — including <br />the oil tank crossing, head and tail sections. <br />1. Dismantle the field conveyor system: <br />- Includes: <br />o Wind Belting and load rolls: $ 3,000.00 <br />o Removal of 40ft. trusses and conveyor stands: $10,000.00 <br />o Removal of oil tank crossing trusses and stands: $ 2,000.00 <br />o Remove concrete bases @ oil tank crossing: $ 1,500.00 <br />o Remove head and tail pulleys, concrete blocks: $ 2,500.00 <br />o Trucking to staging area — 40hrs. x $80 /hr.: $ 3,200.00 <br />Total Estimate: $22,200.00 <br />If you have any questions regarding these cost estimates, please give me a call. <br />Thank you, <br />Joe Doherty <br />(970) 215 -3166 <br />