Laserfiche WebLink
Mr. Steve Tarlton <br />July 17, 2011 <br />Page two <br />Surface water and corrective action groundwater, e.g., pump -back from the SCS dam and <br />Monitor Well 333, will be pumped into the PI until CDPHE approves a new evaporation pond <br />designed to receive new contaminated liquids generated in the future. <br />Groundwater <br />Strategies and actions are currently under review by CDPHE, EPA and Cotter. Cotter expects <br />to participate in the process with CDPHE and EPA while groundwater remedial strategies are <br />developed to meet site remedial objectives. Cotter will continue implementing currently <br />approved remedial actions and plans to implement those established by the foregoing process. <br />Cotter intends to seek an amendment to the Remedial Action Plan to allow storage of surface <br />runoff water behind the SCS Dam once contaminated soils have been removed from the area. <br />License Renewal <br />During the renewal process, Cotter plans to remove obsolete license conditions, such as, but <br />not limited to, the following: <br />• 24 -hour security requirements; <br />• Dose calculation requirements; and <br />• Site Solids and Liquids Management Plan. <br />If you have any questions, please contact me at 719- 275 -7413 (ext. 202). <br />Sincerely yours, <br />S <br />ohn S. Hamrick <br />Vice President, Mill Operations <br />