Laserfiche WebLink
Mr. Steve Tarlton <br />July 17, 2011 <br />Page two <br />Please note: (a) density gages currently stored in the yellowcake storage building will be <br />sent offsite for disposal at an appropriate facility; and (b) Cotter will relocate <br />administrative offices outside the restricted area. <br />3. Cotter will excavate contaminated soils to the interim ALARA goal of 60 AR/hour at a <br />height of one meter for the following: <br />• Footprint of the 1979 Mill; <br />• Soils in the drainage area of the Old Pond Area <br />Survey (SCS) dam; <br />• Boiler /zirconium kiln /demonstration plant area; <br />• Area east of the railroad tracks to OPA; <br />• Ore pads; <br />• OPA area; <br />• Any soils outside of the restricted area, but within <br />risk assessment is not an option. <br />4. The following buildings and structures will not <br />circumstances warrant their removal: <br />• Guard shack; <br />• Laboratory and change house (incl. leach fields); <br />• Main substation; <br />• All railroad structures (tracks, trestle and foundations); and <br />• Maintenance shop. <br />Radioactive Materials License <br />Impoundments <br />( "OPA ") to the Soil Conservation <br />Cotter's property boundary, where <br />be demolished until remedial <br />Subject to CDPHE review and approval, Cotter intends to maintain its Radioactive Materials <br />License for the purpose of processing Mount Taylor orc. The use of this license will be <br />maintained via the Timeliness in Decommissioning process specified by 6 CCR 1007 -1 3.16. <br />Cotter intends to retain the use of the surface of the Secondary Impoundment ( "SI ") for heap <br />leaching in the future. The approximate five-acre arca will be closed with the first layer of <br />random fill placed on top. Settlement monitoring stations will be placed in accordance with <br />the Reclamation Plan. The SI dewatering sump will continue to be pumped into the Primary <br />Impoundment ( "PI "). <br />The PI will continue as a repository for demolition debris and contaminated soils. An area <br />will be left open to receive the remaining buildings and structures detailed above. The liner in <br />the southern portion of the P1 will remain in place until final closure at which time it will be <br />placed in the configuration as shown in the Reclamation Plan. The P1 dewatering sump will <br />continue pumping into the PI pool until a new evaporation cell is constructed. <br />