My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-26_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-07-26_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 2:20:48 PM
Creation date
7/28/2011 1:26:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
7/26/2011
Doc Name
TR-16 approval
From
DRMS
To
Emerald Mining & Leasing, LLC
Type & Sequence
TR16
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 003 State :Colorado <br />Date : 07/26/2011 County :Mineral <br />User : RCO Site :Bulldog Mine <br />Agency or organization name :DRMS <br />Permit or other job action : TR -16 <br />Task description : Recontour road cut <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />100 <br />Source of estimated volume :application estimate <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />LCY <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.26 <br />Bucket Capacity <br />Rated bucket capacity : 0.77 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.68 Rock - Well blasted (60% - 75%) <br />Adjusted bucket capacity : 0.52 LCY <br />Job Condition Correction Factors <br />Site altitude : 9,600 feet <br />Machine description :Cat 315C L <br />Unadjusted hourly unit production : 121.82 LCY /hour <br />Adjusted hourly unit production : 91.00 LCY /hour <br />Adjusted hourly fleet production : 91.00 LCY /hour <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />$23.87 <br />$24.92 <br />$38.72 <br />$87.51 <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.962 per LCY <br />Utilization % <br />NA <br />100 <br />NA <br />Swell <br />factor : NA <br />Permit/job # : M- 1977 -215 <br />Abbreviation :none <br />Filename :M215-003 <br />Altitude adjustment : <br />Job efficiency adjustment : <br />Net job correction : <br />Horsepower : 110 <br />Weight (MT) : 16.90 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />Loose <br />volume : 100 LCY <br />0.90 <br />0.83 <br />0.75 <br />Total job time : 1.10 hours <br />Total job cost : $96 <br />$87.51 <br />minutes <br />Source <br />(Cat HB) <br />(1 shift/day) <br />multiplier <br />
The URL can be used to link to this page
Your browser does not support the video tag.