Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: <br />Date : <br />User: <br />002 <br />07/26/2011 <br />RCO <br />Agency or organization name :DRMS <br />Permit or other job action : TR -16 <br />Task description :Grade drilling pad <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />50 <br />HOURLY PRODUCTION <br />Material consistency description : <br />Consolidated stockpile <br />CCY <br />State : Colorado <br />County :Mineral <br />Site : Buldog Mine <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated volume :application <br />Source of estimated swell factor :program <br />Average push distance : 50 feet <br />Unadjusted hourly production : 300.0 LCY /hr <br />Average push gradient : 5.00 % (pos) <br />Average site altitude : 9,600 feet <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Material weight : 3,300 Ibs /LCY <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />1 Dozer(s) <br />$1.204 /LCY <br />Swell <br />factor : <br />:Cat D4G LGP - 4P <br />:Power Angle Tilt <br />: ROPS Cab <br />:NA <br />$14.20 <br />$22.00 <br />$0.00 <br />$38.54 <br />$74.74 <br />1.215 <br />Permit/job# :M-1977-215 <br />Abbreviation :none <br />Filename : M215 -002 <br />Utilization % <br />NA <br />100 <br />NA <br />NA <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Horsepower : 80 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />Loose <br />volume : 61 <br />Adjusted unit production : 62.07 LCY /hr <br />Adjusted fleet production : 62.07 LCY /hr <br />Total job time : 0.98 <br />Total job cost : $73 <br />$74.74 <br />LCY <br />Source <br />0.75 (avg.) <br />1.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshift/day) <br />0.60 (fnd -st) <br />0.90 (Cat HB) <br />0.88 (Cat HB) <br />0.70 (Cat HB) <br />1.00 (PAT) <br />0.21 <br />Hours <br />