My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (118)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (118)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
7/26/2011 10:22:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 14.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />D = Day Shift N = Night Shift <br />7 <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: October 9, 2010 <br />Reporting Period: 10/03/10 through 10/09/10 <br />Pakt <br />/1/ ame <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Ambient Temperature Range (F): Low: 35 °F to 46 °F ( + / -) High: 51 ° F to 70 ° F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: No issues. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />Subgrade was inspected approved for soil liner fill placement by an AMEC field representative <br />in the area shown on Figure 1. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A50 +00 ( + / -) and <br />A62 +00 ( + / -), approximately 50 feet left of centerline to 50 feet right of centerline; between <br />stations H28 +00 ( + / -) and H34.25 ( + / -), approximately 0 to 200 feet left of centerline; between <br />stations J0 +00 ( + / -) and J11 +00 ( + / -), approximately 0 to 300 feet right of centerline and <br />between stations K7 +50 ( + / -) and K8 +00 ( + / -), approximately 50 to 150 feet left of centerline <br />using various CAT dozers and one Komatsu 300 excavator. <br />C) Cut to Fill <br />1) VLF <br />A CAT 385 excavator was used to excavate material from a designated area in the Cresson pit. <br />The material was loaded into CAT 777 and 40 -ton articulating haul trucks and hauled between <br />stations A51 +00 ( + / -) and A62 +00 ( + / -), approximately 20 feet left of centerline to 20 feet <br />VLF Weekly Report WE 10.09.10.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.