QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 13.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />14,551 <br />156,561 <br />Total <br />14,551 <br />156,561 <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Drain Cover Fill (DCF) was processed during the week. <br />ame <br />IV) VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued performing deployment, <br />seaming, and repair /QC activities. Geomembrane installation was performed in the area shown <br />on Figures 3a, 3b and 3c. Approximately 265,406 square feet of primary 80mil LLDPE and <br />primary 100mil LLDPE was deployed using a John Deere 200 excavator and a John Deere 544 <br />front -end loader with spreader -bar attachments. Subgrade was inspected and approved by <br />AMEC and Lone Star representatives prior to geomembrane deployment (see Figures 3a, 3b <br />and 3c). Approximately 13,891 linear feet of seam was fusion welded using to two fusion <br />welding machines. Twenty -nine destructive test samples were marked during fusion seaming. <br />All destructive tests performed were within project specifications. Non - destructive testing was <br />performed for fusion welded seams. Repairs were performed using the extrusion welding <br />method for all marked defects. Vacuum testing was performed for all extrusion welded seams <br />and repairs. <br />B) Anchor Trench <br />1) VLF <br />Anchor trench backfill was performed between stations G15 +00 ( + / -) and G23 +00 ( + / -) and <br />between stations E21 +00 ( + / -) and E23 +50 ( + / -) using a John Deere 35D excavator and <br />laborers. An AMEC representative observed and inspected the anchor trench backfill. The <br />trench was found to be backfilled in accordance with design drawings and project <br />specifications. <br />Anchor trench excavation was performed between stations K4 +00 ( + / -) and A64 +20 ( + / -) <br />using a CAT 312 excavator and laborers. An AMEC representative observed and inspected the <br />anchor trench excavation. The trench was found to be constructed in accordance with design <br />drawings and project specifications. <br />C) Geomembrane Acceptance <br />1) VLF <br />Primary 80mil geomembrane (P -86 thru P -113) shown on Figure 4a and primary 100mil <br />geomembrane (P -402 thru P -415, P -496 thru P -522, P -524 and P -525) shown on Figures 4b <br />and 4c, were inspected by AMEC and Lonestar representatives and found to be installed within <br />project specifications and acceptable for continued construction activities. <br />VLF Weekly Report WE 10.02.10.D <br />