My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (140)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (140)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
7/26/2011 10:21:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 13.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />inspected by an AMEC field representative and found be constructed in accordance with the <br />design drawings and project specifications. <br />Construction of the 26" high volume solution collection piping was performed fusing the <br />previously perforated pipe sections together. <br />2) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement within the Phase 5 VLF continued. DCF was placed in the <br />area show on Figures 6a and 6b. The DCF was hauled from the processing area to the <br />placement area using CAT 740 haul trucks. The DCF was placed in a 2 -foot lift using a two <br />CAT D -6 LGP dozers and a CAT D -8 dozer except where haul routes were established. Haul <br />route consisted of five -foot lifts to be spread into 2 -foot lifts later. Laborers were present at all <br />times during placement holding the high volume collection piping in place, removing <br />debris /sandbags, and assisting the dozer operator with lift thickness. All DCF was placed on <br />previously approved primary geomembrane. AMEC field representatives monitored the DCF <br />placement constantly. <br />Backfilling of the high volume solution collection risers and manifold was performed using a <br />CAT D -6 LGP dozer and a Komatsu 300 excavator. DCF material was pushed to the Komatsu <br />300 excavator and cast onto the risers. This was performed to allow for the continued <br />construction of the risers. <br />3) Ore Placement <br />Ore placement near the high volume solution collection began using a CAT D -8 dozer. The ore <br />was hauled from the leading edge of the Phase IV heap placement using 40 -ton articulating <br />haul trucks loaded by a CAT 385 excavator. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />VLF Weekly Report WE 10.02.10.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.