My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (140)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (140)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
7/26/2011 10:21:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 13.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />0 <br />121,223 <br />Total <br />0 <br />121,223 <br />F) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />No placement performed during the week. <br />2) Drain Cover Fill (DCF) <br />No placement performed during the week (see Figure 6 for previous DCF placement). <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />No Drain Cover Fill (DCF) was processed during the week. <br />ame9 <br />IV) VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued performing deployment, <br />seaming, and repair /QC activities. Geomembrane installation was performed in the area shown <br />on Figures 3a, 3b, and 3c. Approximately 139,201 square feet of primary 80mil LLDPE, <br />primary 100mil LLDPE and secondary 100mil LLDPE was deployed using a John Deere 200 <br />excavator and a John Deere 544 front -end loader with spreader -bar attachments. Subgrade was <br />inspected and approved by AMEC and Lone Star representatives prior to geomembrane <br />deployment (see Figure 3a, 3b, and 3c). Approximately 7,375 linear feet of seam was fusion <br />welded using three fusion welding machines. Seventeen destructive test samples were marked <br />during fusion seaming. Approximately 674 linear feet of seam was extrusion welded using two <br />extrusion welding machines. Four destructive test sample was marked during extrusion <br />seaming. All destructive tests performed were within project specifications. Non - destructive <br />testing was performed for fusion welded seams. Repairs were performed using the extrusion <br />welding method for all marked defects. Vacuum testing was performed for all extrusion <br />welded seams and repairs. <br />B) Anchor Trench <br />1) VLF <br />Anchor trench backfill was performed between stations B12+00 ( + / -) and B14+00 ( + / -) using a <br />John Deere 35D excavator and laborers. An AMEC representative observed and inspected the <br />anchor trench backfill. The trench was found to be backfilled in accordance with design <br />drawings and project specifications. <br />VLF Weekly Report WE 09.11.10.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.