July 18,2011 C-1980-005/Seneca H Mine SBl <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> N -Availability of Records R -Reclamation Success <br /> N -Backfill&Grading R -Revegetation <br /> N -Excess Spoil and Dev.Waste N -Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> R -Hydrologic Balance R -Signs and Markers <br /> N -Gen. Compliance With Mine Plan N -Support Facilities Not On-site <br /> N -Other N -Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Seneca II Mine conducted by Brock Bowles and Sandy Brown. <br /> Jay James accompanied us on the inspection after safety trained was completed at the Sage Creek <br /> Mine office. Skies were overcast when the inspection started and it rained hard for nearly one hour <br /> during the inspection. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> ❑Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7, <br /> 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring <br /> 4.05.13; Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> Post mining drainage channel PM8 is just east of the CSU shrubplot. Heavy intense rains during the past <br /> week have caused considerable erosion in parts of the channel. Starting approximately 2/3 of the way down from <br /> the top of the shrub plot to just beyond where the channel heads west,there was deep cutting in the channel <br /> displacing much of the rip rap and matting that had been installed. The water broke out of the channel on the east <br /> side,however all flow stayed within the disturbed area and there is little damage to the area where the water <br /> flowed. See attached photos. A small berm adjacent to the fence near the eastern disturbance boundary contained <br /> all the flow; no off site flow was observed. The PM8 channel was also breached at about the point where the <br /> channel starts heading west. This breach will also need to be repaired but the area beneath the breach should <br /> recover without additional work. Near the top of the PM-8 channel,Mr. James said he had observed additional <br /> erosion. Seneca has plans to repair this channel in the near future. Jason Musick will re-inspect the channel prior <br /> to making a decision on the bond release application SL5. <br /> A breach in the contour ditch just below the shrub plot was observed and pointed out to Mr. James. The breach <br /> will need to be repaired so that the flow is contained in the ditch. <br /> RECLAMATION SUCCESS -Rule 4.15,Rule 3: <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 2 of 4 <br />