My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-18_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-07-18_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:48 PM
Creation date
7/25/2011 11:17:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
7/18/2011
Doc Name
Proposed Decision Letter & Form
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR84
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(nun) <br />1 <br />2500.00 <br />-1.00 <br />4.00 <br />3.00 <br />2800 <br />1.16 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(nun) <br />1 <br />2500.00 <br />1.00 <br />4.00 <br />5.00 <br />2795 <br />1.08 <br />Scraper Worksheet Cont'd <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />0.830 <br />Task # 84D <br />NA <br />1.00 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Unit cost: $0.817 /LCY Total job cost: $70,551.57 <br />Page 2 of 2 <br />Site Altitude: 7500 feet <br />1.16 minutes <br />1.08 minutes <br />Total Scraper team cycle time: 3.84 minutes <br />Adjusted for job conditions: 752.19 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 752.19 LCY /Hour <br />Adjusted multiple scraper team (fleet) hourly production: 752.19 LCY/Hour <br />Unadjusted unit production/hour: 906.25 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 114.79 Hours <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Return Route: <br />Net Correction: <br />0.830 <br />Task # 84D <br />NA <br />1.00 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Unit cost: $0.817 /LCY Total job cost: $70,551.57 <br />Page 2 of 2 <br />Site Altitude: 7500 feet <br />1.16 minutes <br />1.08 minutes <br />Total Scraper team cycle time: 3.84 minutes <br />Adjusted for job conditions: 752.19 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 752.19 LCY /Hour <br />Adjusted multiple scraper team (fleet) hourly production: 752.19 LCY/Hour <br />Unadjusted unit production/hour: 906.25 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 114.79 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.