My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-18_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-07-18_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:48 PM
Creation date
7/25/2011 11:17:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
7/18/2011
Doc Name
Proposed Decision Letter & Form
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR84
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />84D <br />7/15/2011 <br />JHB <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $614.60 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Scraper Work Team <br />77,440 <br />86,346 <br />Source of estimated volume: <br />HOURLY PRODUCTION <br />2,100 lbs /LCY <br />Earth - Loam <br />75,000 pounds <br />35.71 LCY <br />SCRAPER TEAM WORK <br />Task description: Replace 48" topsoil Aspen Areas <br />Site: Colowyo Coal Mine Permit Action: TR84 <br />State: Colorado <br />County: Moffat <br />- Scraper: <br />- Dozer: <br />Equipment Description <br />Cat 637G w /push -pull <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.115 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Abbreviation: None <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Page 1 of 2 <br />Permit/Job #: C1981019 <br />Filename: C019 -84d <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$91.74 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$190.61 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$307.30 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$614.60 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />84D <br />7/15/2011 <br />JHB <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $614.60 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Scraper Work Team <br />77,440 <br />86,346 <br />Source of estimated volume: <br />HOURLY PRODUCTION <br />2,100 lbs /LCY <br />Earth - Loam <br />75,000 pounds <br />35.71 LCY <br />SCRAPER TEAM WORK <br />Task description: Replace 48" topsoil Aspen Areas <br />Site: Colowyo Coal Mine Permit Action: TR84 <br />State: Colorado <br />County: Moffat <br />- Scraper: <br />- Dozer: <br />Equipment Description <br />Cat 637G w /push -pull <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Source of estimated swell factor: Cat Handbook <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.115 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Abbreviation: None <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Page 1 of 2 <br />Permit/Job #: C1981019 <br />Filename: C019 -84d <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.