Laserfiche WebLink
Mr. Rex Fletcher, Corps of Engineers <br />April 14, 2000 <br />Page Two <br />water from housing lots will be a minimum of 100 feet wide. It is anticipated that wetland <br />vegetation would be planted in spring/summer of 2003. The projected completion date for Area <br />B wetlands would be approximately four (4) years from present. <br />• Approximately 6.6 acres of existing wetlands, located in the west - southwest area of the property, <br />will not be disturbed prior to completion of wetland restoration in Areas A and B. <br />• Area C (approximately 5.7 acres of wetlands) - Wetlands construction will commence at the <br />completion of mining activities and removal of processing plants at this site. Again, sloping will <br />be done and vegetation planted as noted for Area A and Area B. The anticipated completion date <br />for Area C wetlands is approximately seven (7) years from present. <br />• A total of 18.9 acres of wetlands will be created throughout the course of this project. This is an <br />increase of 5.3 acres over the 13.6 acres required in the existing permit. <br />• Per our discussion on April 5, 2000, we would further request amending out Special Condition C <br />of the existing permit regarding inspections every three years. <br />CAMAS remains committed to providing enhanced wetland and wildlife habitat after mining is <br />completed on this property. We appreciate your assistance with design suggestions and your <br />consideration of allowing CAMAS the additional time necessary to complete this project in a responsible <br />manner that promotes its ultimate success. <br />Please use the following contact at CAMAS for this amendment process: Connie Nickle Davis, Support <br />Services, Aggregate Industries, P. O. Box 3121, Greeley, CO 80633; Telephone: (970) 336 -6526. <br />Very truly yours, <br />Connie Nickle Davis <br />Support Services <br />and <br />Curtt L. Coppage <br />Geologist <br />CAMAS Colorado, Inc. <br />Enclosures — 3 Copies of this Letter <br />4 Color Drawings <br />Cc: Mike Refer, VP of Administration and Public Affairs <br />Pat Ward, VP /GM, Aggregates Division <br />Mark Helm, Northern Operations Manager <br />Mike McAfee, Plant Manager <br />Connie Nickle Davis <br />P. O. Box 3121, Greeley, CO 80633 <br />Telephone: (970) 336 -6526 <br />Fax: (970) 3789 -6856 <br />AGGREGATE <br />INOUSTRIES <br />