Continue SLF placement. <br />Continue subgrade acceptance prior to geomembrane deployment. <br />Continue geomembrane installation. <br />Continue obtaining samples and assisting in the process of DCF material at the DCF Process area. <br />Continue excavation and backlit' of the existing (temporary) Phase 5 anchor trench. <br />Continue geomembrane exposure. <br />Continue installation of the high volume solution collection system. <br />Continue DCF placement. <br />Continue leak detection system installation. <br />Summary of Non - conformances: <br />None Issued <br />amecP <br />Summary of Meetings and Discussions: <br />CC& V: <br />CC &V held a weekly construction meeting on July 12, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. Geomembrane pre - construction topics were also <br />discussed during the meeting. <br />Ames Construction: <br />None <br />AMEC: <br />None <br />Summary of Incidents /Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />July 16, 2011. <br />Joseph Hickey, CQA Monitor <br />Approved By: <br />Date: July 16, 2011 <br />Date: / wL) ( <br />VLF Weekly Report WE 07.16.2011 <br />