My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-22_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-07-22_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
7/25/2011 7:20:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/22/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 7/10/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D) Geomembrane Acceptance <br />1) VLF <br />Primary 80mil geomembrane(P -467, P -477, P -479, P -480, P -484 & P -485) shown on Figure 4 <br />was inspected by AMEC and Lonestar representatives and found to be installed within project <br />specifications and acceptable for continued construction activities. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed slope contouring and subgrade compaction within the Phase 5 VLF. <br />AMEC inspected and approved subgrade prior to SLF placement within the Phase 5 VLF. <br />AMEC observed and assisted in the placement of SLF material within the Phase 5 VLF. <br />AMEC inspected and approved subgrade prior to geomembrane deployment within the Phase 5 VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed the excavation of anchor trenches within the Phase 5 VLF. <br />AMEC observed existing geomembrane exposure within the Phase 5 VLF. <br />AMEC observed the installation of the high volume solution collection system within the Phase 5 VLF. <br />AMEC observed the DCF placement within the Phase 5 VLF. <br />AMEC inspected and approved 80mil primary geomembrane within the Phase 5 VLF. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue subgrade acceptance prior to SLF placement. <br />ame <br />VLF Weekly Report WE 07.16.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.