My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-07-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
7/21/2011 12:50:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/20/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 6/26/2011 and 7/03/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CQA ACTIVITIES: <br />SUMMARY: <br />ame <br />E) Geomembrane Delivery <br />1) VLF <br />Three loads consisting of 2 rolls of 40mil LLDPE and 33 rolls of 80mil LLDPE single sided <br />textured geomembrane was delivered to site during the week. The load was delivered on a flat <br />bed truck in good condition. The rolls were unloaded using a CAT 950 front -end loader with <br />forks attached. The geomembrane was placed on three pieces of HDPE pipe, stacked two rolls <br />high. An AMEC field representative inventoried the geomembrane and was present at all times <br />during unloading and stockpiling of the geomembrane. <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed slope contouring and subgrade compaction within the Phase 5 VLF. <br />AMEC inspected and approved subgrade prior to SLF placement within the Phase 5 VLF. <br />AMEC observed and assisted in the placement of SLF material within the Phase 5 VLF. <br />AMEC inspected and approved subgrade prior to geomembrane deployment within the Phase 5 VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed the excavation of anchor trenches within the Phase 5 VLF. <br />AMEC observed anchor trench backfill within the Phase 5 VLF. <br />AMEC observed existing geomembrane exposure within the Phase 5 VLF. <br />AMEC observed the installation of the high volume solution collection system. <br />AMEC observed the DCF placement. <br />AMEC observed unloading and inventoried geomembrane delivered to site. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />VLF Weekly Report WE 07.02.2011 <br />