Laserfiche WebLink
MINING PLAN EXIBIT C (cow) <br />A large stockpile of specification rock will be created on the <br />site as mining progresses. Once there is an adequate supply, the <br />processing will be shut down and the material will be removed as <br />needed. We expect the mine to operate year around with periods <br />of inactivity when adverse weather conditions exist. <br />We expect to have 9.1 acres +/- or less disturbed at any one <br />time. The bond estimate presented on page 26 shows the amount of <br />land we will disturb at a worse case scenario. At the end of a <br />sorting operation, if there are any vertical faces on the <br />existing stockpiles they will be reduced to 3h to lh so no slope <br />grading will be necessary if operations end prematurely. The <br />floor of the mine will be graded to pre stockpile level. <br />Little or no water will be used at the site. If dust control <br />water is used it will be obtained from on site water provided by <br />the land owner for that purpose. We will make sure it is an <br />approved source for our use. We expect to need less than 1 acre <br />foot of water per year. <br />24 <br />