Laserfiche WebLink
labeling has been rearranged in hopes of making the sites more notable. Please <br />note Exhibit 2010 -7(1) that is scaled for better detail west of 27 road.) <br />d. Due to the volume of information that is relevant and included on this map, is <br />difficult to read and understand. Please submit an additional map in a larger <br />scale focusing on the mine west of 2700 road. Title the map exhibit 2010 -7(1). <br />This map will not replace Exhibit 2010 -7 but will make clear all the details of <br />this area. Be sure to include revisions a, b & c above. <br />(Exhibit 2010 -7(1) is completed and the scale is 1/200 versus 1/400.) <br />e. The current permit (including PR -6) states, "Sampled intensity is 1 sample <br />location per 2.5 acres in areas where the surface spoil functions as s subsoil <br />substitute and 1 sample location per 5 acres in all other areas." The previous TR- <br />57, which governed the 2009 -10 sampling, states "The minimum sampling <br />intensity shall be one hole per map unit or 5 acres whichever is less ". The <br />Morgan property is adequately sampled on a 330ft2 grad ((2.5 acres as PR -6) but <br />the remainder of the mine is sampled on a 600ft2 grid (8.26 acres) which is too <br />large an area b either standard. The areas north of BB Road that were backfilled <br />on 2009 and 2010 should be sampled on a 465112 grid (5 acres). <br />(2.05.1(2)(d) -8 & 9 state "...sample grid is 600 feet by 600 feet... ".) <br />6. Exhibit 2010 -10, 2010 Topsoil Soil Balance — Please clarify or correct the discrepancies <br />listed below for this map: <br />a. In the chart Morgan Soil Back Fill Calculations, the calculations for square feet <br />do not equal the acreage for the corresponding Zones 2 and 3. Zone 2 is 12.21 <br />acres which is 531,868112 (43,560ft2/ac) but is listed as 521,529. Zone 3 is 31.68 <br />acres which is 1,379,981ft2 but is listed as 1,256,371. Please explain the <br />differences in area. <br />(The chart now matches the various Zone areas square footage.) <br />b. The chart "Morgan Soil Back Fill Calculations, is not calculating backfill but <br />rather topsoil. Please rename chart "Morgan Topsoil Replacement Calculations ". <br />(Chart name changed.) <br />c. The chart "Required Morgan Backfill is not calculation backfill bur rather <br />topsoil. Please rename chart "Morgan Topsoil Balance ". <br />(Chart name changed.) <br />d. Please include another chart showing the "Non- Morgan Replacement <br />Calculations ". Include in the chart the calculations (averages & soil depth) used <br />to determine the required fill values used in the "Required Backfill Non - Morgan" <br />chart. <br />