Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Seal 10 Boreholes <br />BOREHOLE <br />- - - � - <br />0.00 <br />$1,521.59 <br />$31,284.44 <br />$1,383.95 <br />$22,864.78 <br />$3,061.42 <br />Regrade roads and pads <br />DOZER <br />290.95 <br />Replace Topsoil on roads and pads <br />DOZER <br />12.87 <br />Revegetate roads and pads <br />REVEGE <br />40.00 <br />Mob/Demob <br />MOBILIZE <br />9.14 <br />SUBTOTALS: <br />352.96 <br />$60,116.18 <br />Task description: <br />Red Mountain Exploration <br />Site: Drilling <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 <br />7/5/2011 <br />PSH <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />COST SUMMARY <br />Permit Action: <br />State: Colorado <br />County: Clear Creek <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />CONTINGENCY: 0.00 <br />Red Mtn Bond Cale Permit/Job #: P2011014 <br />Abbreviation: None <br />Filename: P014 -000 <br />2.02 Total = <br />1.05 Total = <br />0.00 Total = <br />10.00 Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />0.00 <br />0.00 <br />5.00 <br />Total = <br />Total = <br />$1,214.35 <br />$631.22 <br />$0.00 <br />$6,011.62 <br />$7,857.19 <br />$67,973.37 <br />0.00 <br />$0.00 <br />$3,398.67 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $11,255.86 <br />TOTAL BOND AMOUNT (direct + indirect) = $71,372.04 <br />$71,000.00 <br />