Laserfiche WebLink
'5740 <br />\ 5760 <br />S89 57 SOW <br />5780 <br />Direction of Mining <br />S89 57'00'W <br />Direction 4f Mining <br />S89 57'00"W 720' <br />Crusher <br />Pad #2 <br />Blasting Zone #2 <br />pared by Marvin Moore <br />* <br />J4 '6 <br />G° <br />ry 0 <br />f <br />EXHIBIT F <br />(Reclamation Plan Map) <br />Section Line <br />Crusher <br />Pad #1 <br />i <br />5720 <br />5740 <br />5760 <br />The final land use for all of the reclaimed affected land will be for Rangeland <br />q 300' <br />I <br />Scale: 1" = 300' <br />720' <br />5 <br />Moffat County's 20 year plan is to crush around 15,000 cu /yds of limestone an* screen it to size -7/8" <br />before adding around 10% clay to it. This road -base stockpile will last our mai tenance crews about <br />5 years per crushing. In 20 years, Moffat County will have mined 65,000 cu /yds of construction material, <br />which is roughly the equivalent to 4 acres of mined land ten feet deep. Moffat County will complete the <br />exploration program and show the proposed topography of the Blasting zones as soon as we can. <br />