Laserfiche WebLink
Task description: <br />Site: Keeling Pit <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 6/14/2011 <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $158.69 <br />Total Fleet Cost/Hour: $158.69 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Cat D8R Series II - 8SU (2005) <br />310 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />42,000 <br />1.000 <br />42,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 1,400.0 LCY/hr <br />Grade Highwall to a 3:1 ratio <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />-30 % <br />7,600 feet <br />Material weight: 2,900 lbs/LCY <br />$39.08 <br />$81.13 <br />$0.00 <br />$38.49 <br />BULLDOZER WORK <br />State: Colorado <br />County: Huerfano <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />1.000 <br />0.900 <br />1.000 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(EXCL.) <br />(CAT HB)) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit Action: 1 June 2011 Inspection Permit/Job #: M1991081 <br />Filename: M081 -001 <br />CIRCES Cost Estimating Software <br />