Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Grade Highwall to a 3:1 ratio <br />DOZER <br />1 <br />.-1 .-1 ,-I ,-I <br />35.15 <br />$5,577.88 <br />$1,160.68 <br />$4,814.55 <br />$860.12 <br />Spread Topsoil <br />DOZER <br />7.31 <br />Revegetation <br />REVEGE <br />0.00 <br />Mobilization of Equipment <br />MOBILIZE <br />2.34 <br />SUBTOTALS: <br />44.8 <br />$ $12,413.23 <br />Task description: <br />Site: Keeling Pit <br />Task #: <br />Date: <br />User: <br />005 <br />6/14/2011 <br />JLE <br />Cost <br />PROJECT IDENTIFICATION <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />COST SUMMARY WORK <br />Permit Action: 1 June 2011 Inspection Permit/Job #: M1991081 <br />State: Colorado <br />County: Huerfano <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />2.02 Total = <br />1.05 Total = <br />0.00 Total = <br />10.00 Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and /or administration: 5.00 <br />CONTINGENCY: 0.00 <br />Abbreviation: None <br />Filename: M081 -005 <br />Total = <br />Total = <br />$250.75 <br />$130.34 <br />$0.00 <br />$1,241.32 <br />$1,622.41 <br />$14,035.64 <br />0.00 <br />$0.00 <br />$701.78 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $2,324.19 <br />TOTAL BOND AMOUNT (direct + indirect) = $14,737.42 <br />