Laserfiche WebLink
Project: Refuse Pile Project No.: 99 -3983 <br />Location: Foidel Creek Mine Report No.: 60 <br />Client: Twentymile Coal Co. <br />Work Performed: <br />NORTHWEST COLORADO CONSULTANTS, INC. <br />FIELD REPORT <br />Date: 5/27/2011 <br />Time: 4.0 <br />Mileage: 44 <br />Engr. !Tech: CR <br />As requested, we visited the project site on today's date and conducted compaction test No.'s 458 through 461 on <br />the material being placed in the Refuse Pile Expansion. <br />Twentymile Coal Company crews placed and compacted processed Waste Coal in the new Refuse Pile <br />Expansion. <br />We also obtained a sample of the waste coal fill material and returned it to our laboratory in Steamboat Springs, <br />Colorado for standard checkpoint Proctor testing. The sample matched a previous curve on Proctor No. 7P. <br />Remarks: <br />The material tested generally met the project specifications for compaction. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Twentymile Coal Co. was notified of today's test locations. <br />