Laserfiche WebLink
Mike Boulay <br />CAM: Please see revised Map -13 <br />-40- July 8, 2011 <br />116g. The vertical scale on the Sections appears to be 1" = 10' rather than 1" = 5'. <br />Please revise as appropriate. <br />CAM: Please see revised Map -13 <br />Map 15 Haul Road Plan and Profile <br />116h. On the Typical Section for Haul Road #1, please illustrate the limits of the <br />30' easement, and provide an accurate depiction of the roadway dimension <br />and proposed BMPs. <br />CAM: Please see revised Map -15 <br />116i. Please label the contour lines in the plan view on this map. <br />CAM: Please see revised Map -15 <br />Map 16 Loadout Facilities <br />116j. The volume of the proposed Cover Fill pile is given as 15,00 cubic yards, <br />when 15,000 cubic yards is likely intended. Please revise as appropriate. <br />CAM: Please see revised Map -16 <br />Map 17 Coal Handling Facilities Detail Map <br />116k. Construction of the Truck Dump and CMP tunnel will appear to require <br />excavation into the Coke Fines Settling Pond and /or Buried Coke Fines <br />shown on Maps 10 and 11. Please address this subject (excavation in and <br />disposal of coke fines) in the permit text. <br />CAM: Please see revised page 2.05 -9. <br />Map 19 Previously Disturbed Areas <br />1161. Certain areas are cross - hatched on the map, but no cross hatching pattern <br />is identified in the Legend. Please clarify the intent of the cross -hatch <br />pattern. <br />CAM: Cross hatch has been removed on Maps 09 & 19. <br />