Laserfiche WebLink
Mike Boulay <br />CAM Response: Please see revised Map -21. <br />Division Response: Reed Wash is identified on the Rail Spur profile on Map 21, <br />but the bridge is not depicted. Please incorporate a general representation of <br />the bridge onto the rail spur profile. <br />CAM: Please see revised Map -21 <br />-39- July 8, 2011 <br />116a. 2.10.3(1)(b) makes the statement that the land within the permit boundary is <br />owned by the Applicant. With the addition of the Construction Material <br />Borrow Area on property owned by Tavistock Partners, LLC, and the Haul <br />Road #1 easement on Fruita Development, LLC, this statement appears to <br />be in error. Please revise this paragraph as appropriate. <br />CAM: Text was added to clarify land ownership on page 2.10 -1. Page 2.10 -2 is <br />included due to changes in page numbering. <br />Maps 10, 11, and 12 Pre -and post- mining topography and Cross Sections <br />116b. Please add an additional cross section which passes through the Buried <br />Coke Fines Area and crosses the Access Road, Haul Road #2, Rail Loop, <br />and the Truck Dump, following the alignment of the 96" CMP tunnel. <br />CAM: Please see new section H -H' shown on Map -12. <br />116c. On Map 12 Sections E -E' and F -F', please revise the drawing to accurately <br />portray the proposed dimensions of Haul Road #1, the proposed BMPs, <br />and the limits of the 30' easement. <br />CAM: Please se revised Map -12. <br />116d. Please provide the horizontal and vertical scales for Section G -G' on Map <br />12. <br />CAM: Please revised Map -12. <br />Map 13 Drainage Plan Ponds 1 & 2 <br />116e. Please label ponds 1 and 2 in the Plan view. <br />CAM: Please see revised Map -13 <br />116f. Please provide the contour interval for the plan view, and label the contour <br />lines. <br />