Laserfiche WebLink
the site. In addition, the Operator supplied data demonstrating the cost to operate <br />the pump. Please confirm the same pump and associated infrastructure will be <br />installed at this site. Also, please confirm the cost to operate the pump will be the <br />same as the cost at the Kurtz site. <br />Pump design and infrastructure will be equal to or greater than that provided for the <br />Kurtz operation. Pump manufacturer and completed facilities may be provided to the <br />OMLR at the time of the first Annual Report to affirm this statement as assurance <br />regarding pump quality, consistency of discharge infrastructure and operating practices, <br />and unit electric costs. Finally, your financial warranty determination of 21 June 2011, <br />sent 27 June 2011, in the amount of $127,208.22, is agreed to. <br />6.5 Geotechnical Stability Exhibit <br />2. The Division has reviewed the Applicant's response to the Division's Slope Stability <br />Analysis dated June 11, 2011. Please respond to the Division's comments in the <br />attached document and make any necessary changes to the applicable exhibits. <br />The Response continues as iterated below per the Memorandum of 17 June 2011 from <br />Tim Cazier, P.E. NOTE WELL — ONLY those items needing a reply are iterated: <br />Item 1 — Please provide further clarification as to whether any mining anywhere within <br />the permit boundary is proposed below a depth of 45 feet. Your response should also <br />consider the applicant's reclamation plan which proposes pushing up material from the <br />Varra Companies, Inc. correspondence of 29 June 2011 to the Colorado Office of Mined Land Reclamation 2 <br />(OMLR) in reply to OMLR correspondence of 21 June 2011 — Western Sugar Reclamation Land Development <br />Project — M- 2010 -049. <br />