Laserfiche WebLink
June 21,2011 C-1983-059/Terror Creek Loadout JJD <br /> road gate was closed.The light use road along the railroad tracks was passable as well. <br /> REVEGETATION—Rule 4.15 110 Vegetative Cover;Timing: <br /> The revegetated areas of the loadout site generally had a good vegetative cover,although some areas were <br /> turning a little brown. <br /> SLIDES and DAMAGE -Rule 4.12: <br /> The cut and fill slopes of the facilities bench appeared to be stable.There were no indications of any slides <br /> developing. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> There were no problems with the loadout office, shop, substation, fuel facility and coal handling <br /> structures. <br /> TOPSOIL,—Rule 4.060[]Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br /> Redistribution 4.06.4: <br /> The vegetative cover on the south facing slopes of the east side and west side topsoil stockpiles are <br /> beginning to turn a little brown.No erosional problems were noted with either stockpile. <br /> SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS—Rule 4.07 <br /> RECLAMATION PLAN COMPLIANCE—Rule 4.13 <br /> DOCUMENTS RECEIVED-NONE <br /> OTHER(SPECIFY) <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 3 of 4 <br />