My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-29_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2011-06-29_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:01 PM
Creation date
6/30/2011 11:16:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
6/29/2011
Doc Name
Proposed Decision and Findings
From
DRMS
To
Blue Mountain Energy
Type & Sequence
PR7
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 53: THE OPERATOR WILL PROVIDE THE DIVISION WITH A FINAL <br />RECLAMATION PLAN FOR REFUSE PILES RP -2/3/4 AND RP -5A NO LATER THAN 31 <br />JANUARY 2004. THE PLAN SHALL INCLUDE TECHNIQUES TO REDUCE THE <br />OVERLAND SHEET AND RILL FLOW, THEREBY REDUCING CONCENTRATED FLOW <br />OVER THE SURFACE OF THE PILES. <br />Status: This stipulation was satisfied and terminated on 1 September 2004. <br />Revisions to the Permit <br />Minor Revisions and Technical Revisions which have been made to the Deserado Mine permit <br />since the last permit renewal (RN -05) are listed below. <br />Minor Revisions: <br />Minor Revision 140 was received on 13 July 2009, deemed complete on 20 July 2009 and <br />approved on 23 July 2009. The revision dealt with the addition of a nitrogen injection hole for <br />geotechnical information. <br />Minor Revision 141 was received on 20 July 2009, deemed complete on 27 July 2009 and <br />approved on 27 July 2009. The revision dealt with the addition of an emergency generator for <br />back -up power for the mine. <br />Minor Revision 142 was received on 31 August 2009, deemed complete on 10 September 2009 <br />and approved on 18 September 2009. The revision dealt with the addition of five nitrogen <br />injection holes, associated pipeline, four steel buildings and a nitrogen injection plant. <br />Minor Revision 143 was received on 26 March 2010, deemed complete on 5 April 2010 and <br />approved on 15 April 2010. The revision dealt with modifications to the sediment pond DP- <br />1 outlet, the raw water lagoon pumping station and updates to Federal coal lease C -8425. <br />Minor Revision 144 was received on 3 September 2010, deemed complete on 10 September <br />2010 and approved on 20 September 2010. The revision dealt with the drilling of service hole <br />SH -3 and a change to the variety of Western Wheatgrass in the seed mix. <br />Minor Revision 145 was received on 18 February 2011, deemed complete on 28 February 2011 <br />and approved on 9 March 2011. The revision proposed the addition of five degas boreholes and <br />four nitrogen injection holes. <br />Minor Revision 146 was received on 20 April 2011, deemed complete on 26 April 2011 and <br />approved on 26 April 2011. The revision proposed the restringing of the nitrogen pipeline to <br />hole N8 -21. <br />Minor Revision 147 was received on 25 May 2011, deemed complete on 3 June 2011 and <br />approved on 3 June 2011. The revision proposed a revised perimeter and disturbance marker <br />plan. <br />Deserado Mine Permit Revision 07 <br />C- 1981 -018 15 29 June 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.