Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: <br />Date : <br />User: <br />104 <br />05/09/2011 <br />RCO <br />Agency or organization name :DRMS <br />Permit or other job action :Amendment 4 <br />Task description :Replace subsoiland topsoil - only BLM <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 87,120 <br />BCY <br />State : Colorado <br />County :La Plata <br />Site :Montoya Pit <br />Source of estimated volume : 72 ac x 9 inch depth <br />Source of estimated swell factor :na <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,718.9 LCY /hr <br />Material consistency description : <br />Partly consolidated stockpile <br />Average push gradient : 7.50 % (neg) <br />Average site altitude : 6,700 feet <br />Material weight : <br />Weight description : <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Basic machine : Cat DIOR - 10SU (2005) <br />Blade type : Semi - Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />2,550 lbs/LCY <br />1 Dozer(s) <br />$0.258 /LCY <br />Swell <br />factor <br />$89.77 <br />$128.30 <br />$0.00 <br />$38.54 <br />$256.60 <br />Permit/job# : M- 1980 -146 <br />Abbreviation :none <br />Filename :M146 -104 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Horsepower: 570 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />Loose <br />1.330 volume : 115,870 LCY <br />$256.60 <br />Source <br />0.75 (avg.) <br />1.10 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshift/day) <br />0.80 (fnd -rt) <br />1.17 (Cat HB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S /SU /U) <br />0.58 <br />Adjusted unit production : 994.36 LCY /hr <br />Adjusted fleet production : 994.36 LCY /hr <br />Total job time : 116.53 Hours <br />Total job cost : <br />$29,901 <br />