My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-09_REVISION - M1980146
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980146
>
2011-05-09_REVISION - M1980146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:24 PM
Creation date
6/29/2011 9:41:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980146
IBM Index Class Name
REVISION
Doc Date
5/9/2011
Doc Name
Cost summary form
From
DRMS
To
Montoya Pit
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User: <br />103 <br />Agency or organization name :DRMS <br />Permit or other job action :Amendment 4 <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA <br />Area : <br />JOB TIME AND COST <br />05/09/2011 <br />RCO <br />42.00 <br />HOURLY PRODUCTION <br />State :Colorado <br />County :La Plata <br />Site :Montoya Pit <br />Task description :Rip compaction on pit floor - only BLM <br />Source of estimated quantity :AM4 maps <br />Source of estimated load factor :NA <br />Alternate methods - <br />Seismic : Seismic velocity : <br />Unadjusted production : <br />Area : Avg. ripping depth : <br />Average ripping width : <br />Average ripping length : <br />Average dozer speed : <br />Average maneuver time : <br />Production per unit area : <br />Unadjusted production <br />Fleet size : <br />Unit cost : <br />1.00 <br />8.67 <br />400.00 <br />88.00 <br />0.25 <br />0.996 <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />Basic machine : Cat DIOR - 10SU (2005) <br />Blade type : Semi - Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />NA Load factor : <br />acres Rip depth (ft) : <br />NA feet/second <br />NA cu. yds. /hour <br />feet/pass <br />feet/pass <br />feet/pass <br />feet/minute <br />minutes /pass <br />acres /hour <br />: 1,607.08 cu. yds. /hour <br />1 dozer(s) <br />$0.195 per cu. yd. <br />$86.56 <br />$126.50 <br />$8.09 <br />$38.54 <br />$259.69 <br />Permit/job # :M-1980-146 <br />Abbreviation :none <br />Filename :M146 -103 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Horsepower : 570 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : <br />$259.69 <br />Selected estimating method : Area <br />NA Bank volume : <br />1.00 Volume : <br />NA BCY <br />67,760 BCY or CCY <br />Job Condition Correction Factors - <br />Unadjusted production <br />per selected method : 1,607.08 cu. yds. /hour <br />Site altitude : <br />Altitude adjustment : <br />Job efficiency factor : <br />Net job correction : <br />6,700 feet <br />1.00 (Cat HB) <br />0.83 • (1 shift/day) <br />0.83 multiplier <br />Adjusted unit production : 1,333.87 cu. yds. /hour <br />Adjusted fleet production : 1,333.87 cu. yds. /hour <br />Total job time : <br />Total job cost : <br />50.80 hours <br />$13,192 <br />
The URL can be used to link to this page
Your browser does not support the video tag.