My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (150)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (150)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
6/29/2011 9:25:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 11.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL. <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRNLS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />J--- PREVIOUSLY DEPLOYED UNER <br />DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 240,180 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 18,488 SQUARE FEET OF SECONDARY 100 MIL GEOMEMBRANE <br />DEPLOYED DURING WEEK <br />APPROXIMATELY 1,692,495 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />PROJECT <br />ainec <br />EARTH AND ENVIRONMENTAL <br />CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PHASE 5 VLF <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA 100 MIL SECONDARY <br />DESIGNED BY <br />DRAWN BY <br />CMT <br />CMT <br />CARD FILENAME <br />CHECKED BY <br />APPROVED BY <br />JOH <br />JOH <br />DATE <br />07/31/10 <br />flOURE No. REV <br />3b I 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.