Laserfiche WebLink
V `< <br />FA� oo + '� . lo o - $1 ti t p O <br />° g t H 1 pa _ _ _ AN <br />* a Z <br />0 &14 % <br />o <br />( L °I ft ft I " 'VI Nil " **4 ‘ ' SVt7. <br />AT0 iiiiih * <br />4(5 -7111111.1111111t o <br />. O ' <br />It <br />-- 00 - ',/ ; 0 <br />l 0 1 <br />0 <br />w <br />o <br />N .. <br />O ( f • A ,,z/ <br />4.1, III o / <br />ic)c) I; �� <br />4, <br />,0 <br />7 <br />DESIGNED BY <br />CHECKED BY <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, <br />PROPOSED GROUND SURFACE CONTOUR EL. FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />-- PREVIOUSLY DEPLOYED LINER <br />DEPLOYED UNER <br />NOTES: <br />APPROXIMATELY 240,180 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 18,488 SQUARE FEET OF SECONDARY 100 MIL GEOMEMBRANE <br />DEPLOYED DURING WEEK <br />APPROXIMATELY 1,892,495 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />EARTH AND ENVIRONMENTAL <br />CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PHASE 5 VLF <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA 100 MIL PRIMARY <br />CAOD FILENAME <br />GATE <br />07/31/10 <br />FIGURE No REV <br />3a 0 <br />