ame0 <br />Earth & Environmental <br />C) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />D) Soil Liner Fill <br />1) VLF <br />Soil liner fill (SLF) placement continued in the areas shown on Figure 2. Subgrade was <br />approved and moisturized prior to placement using a tandem -axle water truck. Placement was <br />performed using one CAT D -6 dozer and one CAT skid steer loader in a one -foot compacted <br />lift. Moisture conditioning was performed using a tandem -axle water truck and compaction <br />was performed using a 10 -ton vibratory smooth drum compactor. Nuclear density testing, <br />moisture verification, and depth checks were performed in the geomembrane deployment areas <br />throughout the week. All test results were within project specifications and all test locations <br />were surveyed by Ames. <br />Soil liner fill material was hauled and stockpiled in temporary stockpiles near stations A26 +00 <br />( + / -) and H27 +00 ( + / -) using CAT 777 and 10 ton articulating haul trucks loaded by a CAT <br />385 excavator. The SLF was hauled from the East Cresson Clay process. <br />E) Low Volume Solution Collection System <br />1) Low Volume Solution Collection Piping <br />Placement of the low volume solution collection system continued at the LVSCF placement <br />area shown on Figure 5, advancing in front of the placement. Four -inch CPeP was placed and <br />sandbagged in accordance with design drawings, constructing the mainline and the tertiary <br />lines. The secondary geomembrane in the area was accepted prior to pipe placement. <br />2) Low Volume Solution Collection Fill (LVSCF) <br />Low volume solution collection fill (LVSCF) material placement within the Phase 5 VLF <br />continued. LVSCF was placed in the area show on Figure 5. The LVSCF was hauled from the <br />processing area to the placement area using CAT 740 haul trucks loaded by a 988 front -end <br />loader. The LVSCF was placed in a 3 -foot lift a CAT D -8 LGP dozer, except were haul routes <br />were established. Haul routes consisted in five -foot lifts, to be spread into 3 -foot lifts later. <br />Laborers were present at all times during placement holding the low volume solution collection <br />piping in place, removing debris /sandbags, and assisting the dozer operator with lift thickness. <br />All LVSCF was placed on previously approved secondary geomembrane. AMEC field <br />representatives observed placement constantly. <br />F) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />Placement of the high volume collection system continued at the DCF placement area shown <br />on Figure 6, advancing in front of the placement. CPeP was placed and sandbagged in <br />accordance with design drawings and project specifications. The primary geomembrane in the <br />area was accepted prior to pipe placement. <br />VLF Weekly Report WE 07.31.10.D <br />