2010-11-15_REVISION - M1980244 (150)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (150)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
6/29/2011 9:25:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 11.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />E Cresson Clay Processing <br />8,259 <br />173,363 <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />8,259 <br />405,767 <br />ame0 <br />Earth & Environmental <br />I) Miscellaneous <br />No work was performed during the week. <br />III) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. Storm water controls are being observed in the East Cresson Clay Borrow. <br />IV) VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued throughout the week, performing <br />deployment, seaming, and repair /QC activities. Geomembrane installation was performed in <br />the area shown in Figure 4. Approximately 152,433 square feet of 100mil LLDPE <br />geomembrane was deployed using a John Deere 200 excavator and a John Deere 544 front -end <br />loader with spreader -bar attachments. Subgrade was inspected and approved by AMEC and <br />Lonestar representatives prior to geomembrane deployment (see Figure 4). Approximately <br />7,180 linear feet of seam was fusion welded during deployment using up to three fusion <br />welding machine. Thirteen destructive test samples were marked during fusion seaming. All <br />destructive sample test results met project specifications. Non - destructive testing was <br />performed for all fusion welded seams. Repairs were performed using the extrusion welding <br />method for all marked defects. Vacuum testing was performed for all extrusion welded seams <br />and repairs. <br />After reworking of the "F" liner bench, the subgrade was inspected and approved for 80mil <br />(primary) replacement. The geomembrane that was previously pulled back was replaced <br />overlapping the 100mil (PSSA) primary a minimum of three feet. <br />B) Geomembrane Acceptance <br />1) VLF <br />After air testing was performed, the geomembrane in the anchor trench was accepted to allow for <br />backfilling. <br />VLF Weekly Report WE 07.10.10.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.