Laserfiche WebLink
1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit production: 1,485.12 LCY/hr <br />Adjusted fleet production: 5940.48 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />Net correction: 0.5403 <br />4 Dozer(s) <br />$0.180 /LCY <br />1.89 Hours <br />$2,025.14 <br />Task # 014 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />