Laserfiche WebLink
Task description: <br />Site: Williams Fork Mines <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />014 <br />22- Jun -11 <br />JRS <br />HOURLY EQUIPMENT COST <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$267.34 <br />$1,069.36 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />10,000 <br />1.125 <br />11,250 LCY <br />Average site altitude: 5,400 feet <br />Regrade Mine No. 9 Refuse Pile <br />State: <br />County: <br />Agency or organization name: DRMS <br />Cat D1OR - 10SU (2005) <br />570 <br />Semi- Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />$80.89 <br />$147.96 <br />$0.00 <br />$38.49 <br />Unadjusted hourly production: 2,748.7 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0 % <br />Material weight: 2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.000 <br />Dozing method: 1.000 <br />BULLDOZER WORK <br />Permit Action: 2011 Midterm Review Permit/Job #: C1981044 <br />Colorado <br />Moffat <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: C044 -014 <br />CIRCES Cost Estimating Software <br />