My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-28_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2011-06-28_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:56 PM
Creation date
6/28/2011 1:30:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
REVISION
Doc Date
6/28/2011
Doc Name
2011 Midterm Review Findings Document
From
DRMS
To
Moffat County Mining, LLC
Type & Sequence
MT6
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Total job time: <br />Total job cost: <br />Net correction: 0.3513 <br />Adjusted unit production: 238.88 LCY /hr <br />Adjusted fleet production: 955.52 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />4 Dozer(s) <br />$1.126 /LCY <br />60.93 Hours <br />$65,565.82 <br />Task # 007 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.