Laserfiche WebLink
Task description: <br />Site: Williams Fork Mines <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Average push gradient: <br />Average site altitude: <br />007 State: Colorado <br />22- Jun -11 County: Moffat <br />JRS <br />Cat D1OR - 10SU (2005) <br />570 <br />Semi - Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />$269.03 <br />$1,076.10 <br />MATERIAL QUANTITIES <br />51,750 <br />1.125 <br />58,219 LCY <br />Source of estimated volume: Table 63; Map 26 <br />Regrade Portal No. 5 Facilities Area <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 275 feet <br />Unadjusted hourly production: 680.0 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />5% <br />5,400 feet <br />Material weight: 2,650 lbs/LCY <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 0.900 <br />Dozing method: 1.000 <br />BULLDOZER WORK <br />$80.89 . <br />$147.96 <br />$1.69 <br />$38.49 <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Permit Action: 2011 Midterm Review Permit/Job #: C1981044 <br />Utilization % <br />NA <br />100 <br />15 <br />NA <br />Source <br />(AVG.) <br />(CAT HB)) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: C044 -007 <br />CIRCES Cost Estimating Software <br />