My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (113)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (113)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
6/28/2011 12:05:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. III, Appendix D,Weekly Reports, Part 9
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />D <br />- <br />N <br />N <br />N <br />N <br />N <br />- <br />D = Day Shift N = Night Shift <br />amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: May 1, 2010 <br />Reporting Period: 4/25/10 through 5/1/10 <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Ambient Temperature Range (F): Low: 18 ° F to 25 ° F ( + / -) High: 37 °F to 60 ° F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: Work activities were limited on Monday (4/26/2010) due to fill and haul route preparations <br />necessary due to the weekend snowstorm. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Stripping <br />1) VLF <br />Topsoil stripping was performed during clay excavation using one CAT D -8 dozer and one <br />CAT 330 excavator at the East Cresson Clay Borrow. Haulage of topsoil to the East Cresson <br />Clay Borrow topsoil stockpile continued using tandem -axel haul trucks. <br />B) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations B0 +00 ( + / -) and <br />B8 +00 ( + / -), approximately 10 to 250 feet right of centerline; between stations C1 +00 ( + / -) and <br />C7 +00 ( + / -), approximately 50 to 70 feet right of centerline; between stations E0 +00 ( + / -) and <br />E5 +00 ( + / -), approximately 300 feet left of centerline to 50 feet right of centerline; between <br />stations F0 +00 ( + / -) and F12 +00 ( + / -), approximately 100 feet left of centerline to 300 feet <br />right of centerline; between stations G4 +00 ( + / -) and G7 +00 ( + / -), approximately 0 to 100 feet <br />left of centerline; between stations G12 +00 ( + / -) and G30 +00 ( + / -), approximately 0 to 100 <br />VLF Weekly Report WE 05.01.10.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.