Laserfiche WebLink
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />- <br />- <br />N <br />N <br />N <br />N <br />- <br />- <br />D = Day Shift N = Night Shift <br />• <br />amec <br />Earth & Environmental <br />VLF EARTHWORKS EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: April 24, 2010 <br />Reporting Period: 4/18/10 through 4/24/10 <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Ambient Temperature Range (F): Low: 25 ° F to 39 ° F ( + / -) High: 36 °F to 64 ° F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: All work activities (day and night shift) were suspended for Friday (4/23/2010) and Saturday <br />(4/24/2010) due to heavy snowfall. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Stripping <br />1) VLF <br />Topsoil stripping was performed during clay excavation using one CAT D -8 dozer and one <br />CAT 330 excavator at the East Cresson Clay Borrow. Haulage of topsoil to the East Cresson <br />Clay Borrow topsoil stockpile continued using tandem -axel haul trucks. <br />B) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations E4 +00 ( + / -) and <br />E6 +00 ( + / -), approximately 50 to 100 feet right of centerline; between stations F0 +00 ( + / -) and <br />F14+00 ( + / -), approximately 0 to 100 feet right of centerline; between stations G5 +00 ( + / -) and <br />G9 +00 ( + / -), approximately 0 to 75 feet left of centerline; between stations H1 +50 ( + / -) and <br />H3 +50 ( + / -), approximately 25 feet left of centerline to 75 feet right of centerline; and between <br />stations H18 +00 ( + / -) and H24 +00 ( + / -), approximately 75 to 300 feet right of centerline. <br />VLF Weekly Report WE 04.24.10.D <br />