My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (113)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (113)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
6/28/2011 12:05:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. III, Appendix D,Weekly Reports, Part 9
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Earth & Environmental <br />D) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road near stations A28 +00 ( + / -) to A36 +00 <br />( +/ -). <br />E) Cut to Fill <br />1) VLF <br />A CAT 385 excavator and a John Deere 850 excavator were used to excavate structural fill <br />material from the following areas: between stations F5 +00 ( + / -) and F7 +50 ( + / -), <br />approximately 50 to 100 feet right of centerline; between stations H4 +00 ( + / -) and H10 +50 <br />( + / -), approximately 20 to 100 feet left of centerline; between stations; H24 +00 ( + / -) and <br />H26 +00 ( + / -), approximately 75 to 100 feet right of centerline; and between stations K11 +00 <br />( + / -) and K13 +00 ( + / -), approximately 20 to 100 feet right of centerline. The structural fill <br />material was loaded into CAT 777 haul trucks and hauled to fill areas. <br />Prior to structural fill placement existing fill areas were ripped and frost was allowed to thaw <br />or was removed. Existing fill temperature were monitored and found to be above 32 °F before <br />fill placement. An AMEC representative monitored ambient temperatures on an hourly basis <br />during fill placement. Fill temperatures were monitored during ambient temperatures below <br />32 °F and ranged between 33 ° F to 39 ° F. <br />Structural fill was placed in the following areas: between stations C0 +50 ( + / -) and C3 +00 ( + / -), <br />approximately 75 feet left of centerline to 75 feet right of centerline; between stations F7 +50 <br />( + / -) and F12 +50 ( + / -), approximately 120 feet left of centerline to 30 feet right of centerline; <br />and between stations J8 +00 ( + / -) and J14 +00 ( + / -), approximately 50 to 200 feet right of <br />centerline. Structural fill was placed in 18" to 24" lifts using various CAT dozers. Each lift was <br />moisture conditioned using a CAT 773 water truck (when necessary) and compacted using a <br />10 -ton vibratory smooth drum compactor, passing over the entire fill surface at least 4 times <br />(method compaction technique is applicable). Ambient and fill temperatures were monitored <br />and recorded during fill placement. <br />Blast pattern drilling was performed between stations H4 +00 ( + / -) and 1110 +00 ( + / -), <br />approximately 20 to 90 feet left of centerline. Blasting was performed on Monday (3/29/2010), <br />Tuesday (3/30/2010) and Friday (4/2/2010). No blasting was performed Wednesday <br />(3/31/2010), Thursday (4/1/2010) and Saturday (4/3/2010). <br />F) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of Soil Liner Fill material continued this week. A CAT D -8 dozer, a CAT 320 <br />excavator, a CAT 966 front -end loader, and tandem -axel haul trucks were used to excavate, haul, <br />and process the material. The processing plant went down Tuesday (3/16/2010) due to mechanical <br />problems. <br />VLF Weekly Report WE 04.03.10.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.