Laserfiche WebLink
SCC should also place the excavated material in a manner that will ensure that flow from the <br />spoil spring near Culvert J -2A is routed directly to Pond 016 and not allowed to pool and <br />saturate the embankment material. <br />17. -24. Responses previously accepted. <br />25. Resolved. <br />26. Resolved. <br />27. — 30. Responses previously accepted. <br />Please call me if you have any questions or need additional information. <br />Sincerely, <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />cc: Marcia Talvitie, DRMS <br />Sandy Brown, DRMS <br />Page 2 of 2 <br />