My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-06-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
6/28/2011 10:09:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/27/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 6/5/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMEC observed slope contouring and subgrade compaction within the Phase 5 VLF. <br />AMEC inspected and approved subgrade prior to SLF placement within the Phase 5 VLF. <br />AMEC observed and assisted in the placement of SLF material within the Phase 5 VLF. <br />AMEC inspected and approved subgrade prior to geomembrane deployment within the Phase 5 VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed the excavation and backfill of anchor trenches within the Phase 5 VLF. <br />AMEC observed and inventoried geomembrane delivered to site. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue receiving geomembrane to site. <br />Continue geomembrane exposure. <br />Continue subgrade acceptance prior to geomembrane deployment. <br />Continue soil liner fill placement. <br />Continue excavation and backfill of the existing (temporary) Phase 5 anchor trench. <br />Continue geomembrane installation. <br />Summary of Non - conformances: <br />None Issued <br />Ames Construction: <br />None <br />one <br />Summary of Meetings and Discussions: <br />CC& V :: <br />CC &V held a weekly construction meeting on June 6, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. Geomembrane pre - construction topics were also <br />discussed during the meeting. <br />VLF Weekly Report WE 06.11.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.