Laserfiche WebLink
Kerr (Marr) Mine - 2010 Annual Hydrology Report <br />7.0 FUTURE MONITORING <br />During the 2010 water year, monitoring activities were conducted according to methodologies and <br />procedures presented in the approved Kerr Water Monitoring Plan with reductions to the program as <br />approved by the DRMS since issuance of the Monitoring Plan. For convenience, Table 61, "Kerr Area <br />Hydrologic Monitoring Schedule" is included with this report in Appendix A. Monitoring activities in the <br />2011 water year will continue to be conducted in accordance with approved procedures for the Loadout <br />area until a final bond release is submitted and also approved or until authorization is provided by the <br />DRMS and associated agencies to terminate monitoring. <br />6 <br />